Indiana Limestone Fabricators is early in a lean manufacturing transformation. This is the honest story of where we are, where we’re going, and why we’re investing in the people and equipment to get there.

Author  Donovan Garletts, President & CEO Location  Spencer, Indiana Category  Behind the Mill

Every fabrication shop has waste. Most don’t talk about it. We’re talking about it — because acknowledging the problem is the first step to eliminating it, and eliminating it is how we become the highest quality Indiana limestone fabricator in the world.

That’s not a marketing line. It’s the actual aspiration driving decisions at ILF right now. And getting there requires being brutally honest about where we are today.

We’re early in our lean journey. The mill has inefficiencies. Processes that could take two steps take six. Material moves when it shouldn’t. Time gets lost that shouldn’t be lost. We know it. We’ve been studying it. And we’ve brought in serious people to help us fix it.

This post is the honest version of that story — not the polished press release version.

The Problem

What Waste Actually Looks Like in a Stone Mill

Lean manufacturing defines waste as anything that doesn’t add value for the customer. Motion that doesn’t need to happen. Waiting that slows production. Overprocessing steps that consume time without improving the product. Defects that require rework.

In a limestone fabrication facility, waste is everywhere once you know how to see it. Stone moved twice when it should be moved once. Tools not where they’re needed when they’re needed. Setups that take longer than they should. Information that doesn’t flow clearly from the shop drawing to the saw to the CNC to the finishing floor.

Lean manufacturing identifies eight specific categories of waste — known in the Toyota Production System as the 8 Wastes. Learning to see them in our own operation has been one of the most valuable and uncomfortable exercises of this process.

The 8 Wastes — What We’re Looking At

1
Defects — stone cut to wrong dimensions, incorrect finish applied, pieces that require rework. Every defect consumes material, time, and capacity twice.
2
Overproduction — cutting more than what’s needed, when it’s needed. Produces inventory that takes up space, gets damaged, and masks real production problems.
3
Waiting — stone sitting between operations. Operators waiting for equipment. Jobs waiting for information. Waiting is the most visible waste in a fabrication shop once you know to look for it.
4
Non-Utilized Talent — the knowledge and problem-solving ability of our people not being used. When improvement is only management’s job, most of the organization’s intelligence goes to waste.
5
Transportation — moving stone or materials from one place to another without adding value. Every unnecessary move is a chance for damage and a cost with no return.
6
Inventory — excess raw material, work in process, or finished goods beyond what’s immediately needed. Inventory hides problems, consumes space, and ties up capital.
7
Motion — unnecessary movement by people. Reaching, searching, walking to find a tool that should be at the point of use. Motion waste is exhausting and adds nothing.
8
Extra Processing — doing more work than the customer requires. Steps that consume time and resources without improving the final product. Common in operations where processes have never been questioned.

The uncomfortable truth: most of this waste is invisible until you’ve been trained to see it. We weren’t trained. We ran the shop the way shops get run — by habit, by tribal knowledge, by “this is how we’ve always done it.” And that’s exactly the problem.

Paul Akers of FastCap built the framework we’re studying: 2 Second Lean. The idea is deceptively simple — every day, every person identifies waste that can be fixed in two seconds and fixes it right then. Not a two-second problem — a two-second fix. The point is to make improvement immediate, tangible, and habitual rather than theoretical. Stack those fixes across a team over months and years, and the cumulative effect is transformational. We’re implementing this framework at ILF. We’re at the beginning. But we’ve started.

Before you can fix waste, you have to see it. Before you can see it, you have to be willing to look. That willingness is harder than it sounds when the waste is your own operation.

— Donovan Garletts, President & CEO, ILF
The People

Who We’re Learning From

We didn’t try to figure this out alone. Lean manufacturing has a deep body of practice and a community of practitioners who have done this work in real facilities. We went looking for the best of them.

⚙️

Toyota Material Handling — Lean Consultants

We engaged lean consultants with Toyota Material Handling backgrounds — people trained in the Toyota Production System, the original source of modern lean manufacturing. These aren’t theorists. They’ve implemented lean in real manufacturing environments and know what the gap between the textbook and the shop floor actually looks like. Their input on our current state has been direct, specific, and humbling in the best way.

🏭

Henry Holsters — The Benchmark

We’ve visited and studied Henry Holsters — a lean manufacturing operation that has built something genuinely exceptional. Their facility, their processes, and their culture are what ILF is working toward. Not a copy — an adaptation of the principles to a stone fabrication environment. Henry Holsters is the picture on the wall. We’re building toward it.

The common thread across everyone we’ve learned from: lean isn’t primarily about tools or techniques. It’s about culture. A facility where every person is empowered to identify waste and fix it is fundamentally different from one where improvement is someone else’s job. Building that culture is the real work — and it takes years, not months.

The Investment

What We’re Putting Into the Mill

Culture change and process improvement are the foundation. But lean manufacturing also requires capable equipment — machines that don’t create waste through breakdowns, inaccuracy, or bottlenecks. We’re investing in both simultaneously.

Current Equipment Investments

COMPLETE
Simplified Material Handling Equipment — replaced complicated handling equipment with older, proven models. Fewer breakdowns. Less downtime. A direct lean principle in action: the simplest reliable solution beats the sophisticated unreliable one every time.
COMPLETE
Automated Slab Saw — automation of the slab saw removes manual intervention from a critical cutting stage. Consistent feed rates, repeatable cuts, less operator handling. A direct reduction in motion waste and defect risk.
COMPLETE
60″ Blade Saw with Automation and Multidirectional Cutting — the 60″ blade saw now operates with integrated automation and multidirectional cutting capability. What previously required repositioning the stone — adding handling steps and error risk — can now be executed in a single operation. Faster. More accurate. Less waste.
IN DESIGN
CNC with Multiple Tool Heads and Blades — currently in the design and specification stage. A machine with multiple tool heads and blades dramatically expands what ILF can produce without repositioning or tool changes — complex profiles, undercuts, and carved details that currently require multiple setups executed in a single operation. Fewer setups. Less handling. Less opportunity for error.
30K Square foot heated mill facility
20+ Acres of site at the crossroads of America
30+ Years of fabrication experience behind every project
The Destination

What We’re Building Toward

The destination isn’t a specific piece of equipment or a certification or a consultant’s sign-off. It’s a facility and a culture that eliminates waste systematically — where every person on the floor is actively improving their work environment every single day, where the stone moves efficiently from saw to CNC to finish to shipping, and where the customer gets a better product because the process behind it is better.

Henry Holsters didn’t get where they are overnight. Toyota didn’t build the Production System in a year. Lean transformation is measured in years of consistent effort, not months of initiative. We’re at the beginning of that timeline. We know it. And we’re committed to the long version.

What this means for customers in the near term: the investments we’re making now — in equipment, in process, in people — are building toward shorter lead times, tighter tolerances, and higher consistency in finished product. We’re not there yet. We’re working toward it with every improvement, every day.

What it means for the long term: ILF’s stated aspiration is to be the highest quality Indiana limestone fabricator in the world. That’s not achievable without a lean operation behind it. You can’t produce world-class stone from a facility full of waste. So the lean work isn’t separate from the quality aspiration — it’s how we get there.

We’re covered in waste and we know it. That’s actually a good place to start — because it means there’s nowhere to go but better.

— Donovan Garletts, President & CEO, ILF
The Invitation

Come Watch Us Work

One of the things we’ve learned from the lean community is the value of transparency. Lean facilities open their doors. They let people see the work — not because everything is perfect, but because the improvement process is visible and ongoing and worth seeing.

ILF is in Spencer, Indiana. If you’re an architect, contractor, or builder working with Indiana limestone — or thinking about it — come see the operation. Walk the mill. See how stone gets from a quarry block to a numbered panel ready to set. Ask hard questions about our process. We’ll give you honest answers about where we are and where we’re going.

The stone that built America’s most important buildings is still coming from southern Indiana. We’re building the operation that will fabricate it better than it’s ever been fabricated before. We’re early. We’re working. And we’re not stopping.

Visit the Mill

Spencer, Indiana. Come see the operation, the equipment, and the stone. We’ll show you everything.